- All
- Apartments
- BOUNDARY WALL
- Custom Homes and Multi-Family Units
- dam
- ENGINEERING SURVEY
- Hotels
- Industrial Facilities
- Infrastructure Projects:
- Renovations and Remodels
- Solar mounting structures
RESIDENNTIAL –GIKAMBURA-KIKUYU
This is the Proposed Five bedroom residential house in Nachu Kiambu county. The project cov- ered Civil/structural works, light
RESIDENNTIAL –GIKAMBURA-KIKUYU
This is the proposed five-bedroom residential house in Nachu, Kiambu County. The project covered civil/structural works, light-gauge roof structure, underground water tank, and wastewater management system to filter water for gardening.
RESIDENNTIAL -NACHU-KIKUYU
This is the Proposed Three bedroom residential house in Nachu Kiambu county. The project cov- ered Civil/structural works, light
RESIDENNTIAL -NACHU-KIKUYU
Access road paving
Storm water drains
Foul water drainage to the county open drain
RESIDENNTIAL APARTMENT-NGONG
Access road paving Storm water drains Foul water drainage to the county open drain
RESIDENNTIAL APARTMENT-NGONG
Access road paving
Storm water drains
Foul water drainage to the county open drain
Suswa Sub-station civil works &drainage
Access road paving Storm water drains Construction of band wall
Suswa Sub-station civil works &drainage
Access road paving Storm water drains Construction of band wall
RESIDENTIAL HOUSE-KANTAFU
This is a 5 bed room house for Mr. Victor in Kantafu off kagundo road. It consists of a
RESIDENTIAL HOUSE-KANTAFU
This is a 5-bedroom house for Mr. Victor in Kantafu off Kagundo Road. It consists of a reinforced concrete ma- sonry structure with the necessary infrastructure.
ENGINEERING SURVEY-MASAI MARA
Topographical survey in Masai Mara
RESIDENNTIAL -NACHU-KIKUYU
This is the Proposed Five bedroom residential house in Nachu Kiambu county. The project cov- ered Civil/structural works, light
RESIDENNTIAL -NACHU-KIKUYU
This is the proposed five-bedroom residential house in Nachu, Kiambu County. The project covered Civil/structural works, light gage roof structure, underground water tank, waste water management system to filter water for gardening.
RESIDENNTIAL -NACHU-KIKUYU
This is the Proposed Five bedroom residential house in Nachu Kiambu county. The project cov- ered Civil/structural works &
RESIDENNTIAL -NACHU-KIKUYU
This is the Proposed Five bedroom residential house in Nachu Kiambu county. The project cov- ered Civil/structural works & a flat rooftop.
RESIDENNTIAL APARTMENT-NGONG
This is the Proposed Five story residential build- ing with basement parking in Ngong town Kajiado county. The project
RESIDENNTIAL APARTMENT-NGONG
This is the Proposed Five story residential build- ing with basement parking in Ngong town Kajiado county. The project covered Civil/structural works, and waste water management.
The works mainly Basement parking, Two bed- room units & a flat rooftop.
Gulf link warehousing
This is the Proposed Gulf link ware- housing in Kiangombe Nairobi. The project covered Civil/structural works. The works mainly
Gulf link warehousing
This is the Proposed Gulf link ware- housing in Kiangombe Nairobi. The project covered Civil/structural works. The works mainly steel structure stor- age warehouses & a five story office block.
We were involved in Topographical survey, setting out and waste/ storm water drainage desin.
Uluma Residential house- Kakamega
This is a 3 bed room house, It consists of a masonry structure, Land scaping, boundary wall, civil works
Uluma Residential house- Kakamega
This is a 3 bed room house, It consists of a masonry structure, Land scaping, boundary wall, civil works and waste man- agement.
Baptist Children Centre-Saika
This is our ongoing project, 965m long perime- ter wall around a children centre in Saika Kasa- rani constituency
Baptist Children Centre-Saika
Renovation of 10 classrooms, foundation waterproofing, floor renovations, and paving around classrooms
BACKNER KENYA – BOUNDARY WALL
This is our ongoing project, 965m long perime- ter wall around a children centre in Saika Kasa- rani constituency
BACKNER KENYA – BOUNDARY WALL
This is our ongoing project, 965m long perime- ter wall around a children centre in Saika Kasa- rani constituency Nairobi managed by Buckner Kenya. We’re building in phases, phase one in progress. To include razor wire & electrical wire.
See the attached Memorandum of agreement for phase one
THE CLIFF HOTEL-LAKE NAKURU
This is a hotel built along the cliff in lake Nakuru game park. It consists of a steel suspended
THE CLIFF HOTEL-LAKE NAKURU
This is a hotel built along the cliff in lake Nakuru game park. It consists of a steel suspended deck, steel structure frames covered with double wall canvas. The structures include,12 rooms, gym, restau- rant, kitchen, bar, swimming pool, recep- tion room, generator room, chain link fence, solar system for lighting/hot water, parking & waste management system with the necessary infrastructure.
LEAN ENERGY LTD
We became the preferred contractor for Lean Energy to fabricate steel roof access structures, roof walkway structures & Solar
LEAN ENERGY LTD
We became the preferred contractor for Lean Energy to fabricate steel roof access structures, roof walkway structures & Solar mounting structures for their solar power projects i.e Vision plaza in Nairobi, Upland mil processing in Kiambu, Lauren international in Thika etc.
ISINYA APARTMENT
This is a 2 & 1 bed roomed houses for Mr. Bernard Were in Isinya town. It consists of a
ISINYA APARTMENT
This is a 2 & 1 bed roomed houses for Mr. Bernard Were in Isinya town. It consists
of a reinforced concrete masonry struc- ture with the necessary infrastructure, civil works, underground rain water tank, and waste management system.
4 bed room house for Mr. Charles Munyoki in Katani
This is a 4-bedroom house for Mr. Charles Munyoki in Katani. It consists of a reinforced concrete masonry structure,
4 bed room house for Mr. Charles Munyoki in Katani
This is a 4-bedroom house for Mr. Charles Munyoki in Katani. It consists of a reinforced concrete masonry structure, civil works, an underground rainwater tank, and a waste management system.
REV. JOHN ANZAYA 5-bedroom house – KATANI
This is a 5-bedroom house. It consists of a reinforced concrete masonry structure with boundary wall and civil works,
REV. JOHN ANZAYA 5-bedroom house – KATANI
This is a 5-bedroom house. It consists of a reinforced concrete masonry structure with boundary wall and civil works, under- ground rain water tank, fully fitted and run on solar system and waste management system.
10T Crane for Metro concept
This is a Proposed installation of 10T Crane for Metro concept along Lunga lunga road industrial Area. Involved in
10T Crane for Metro concept
This is a Proposed installation of 10T Crane for Metro concept along Lunga lunga road industrial Area. Involved in steel structural design, fabrication, crane installations and construction of foundation bases.
Longonot Gate development dam
This is a Proposed design and build for Longonot Gate development dam with ca- pacity of 0.8M cubic meters
Longonot Gate development dam
This is a Proposed design and build for Longonot Gate development dam with ca- pacity of 0.8M cubic meters of water and water Reticulation.
THIKA GREENS GOLF RESORT DAM
This is a Proposed design and build for Thika green resort dam with capacity of 1M cubic meters of
THIKA GREENS GOLF RESORT DAM
This is a Proposed design and build for Thika green resort dam with capacity of 1M cubic meters of water.












